John James Audubon Bridge
POT & ELASTOMERIC BEARINGS
Louisiana Department of Transportation and Development (LADOTD)
Project No. 052-02-0024
New Mississippi River Project – John James Audubon
Bridge DB Project
Point Coupee Parish, Louisiana
Contractor: Audubon Bridge Constructors, A Joint Venture
For Bridge 3-2 of the West High Level Approach and the Bridge 3 Cable-Stayed Unit, Cosmec, designed and manufactured a combined total of 63 Guided Expansion, Non-Guided Expansion and Fixed Pot Bearings along with Vertical and Transverse Elastomeric Bearing Assemblies. In addition to the design and manufacture of the bearings, Cosmec designed and produced custom lifting and installation devices as requested by the customer.